Working on overhead lines and pylons requires the technician to raise all tools and equipment to the work site. This can be several meters in the air and tiring for workers who must first climb and then hand-lift the equipment.

By using the Harken PowerSeat rigged through deflection pulleys (in this case the Utility Snatch block), lifting capacity was increased and the weight of the equipment reduced, making workers more efficient over a longer period of time..